ITAC Assessment: BD0064
ITAC logo
ITAC Assessment: BD0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Liftgates
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 80,000
ft2
Annual Production 3,500
pieces
Production Hrs. Annual 4,394
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,760 538,687
kWh
Electricity Demand $26,827 2,198
kW-mo/yr
Electricity Fees $322 -
Natural Gas $20,345 6,235
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,179

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,937 $12,900 $4,212
120,750
kWh
$4,021
-
kW-mo/yr
$704
02 2.4224: Upgrade controls on compressors $4,038 - $1,395
39,859
kWh
$2,643
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $1,364 $3,750 $792
22,567
kWh
$572
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $551 $525 $278
7,913
kWh
$273
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $526 $300 $266
7,620
kWh
$260
-
kW-mo/yr
-
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $12,314 $3,580 - - $12,314
TOTAL RECOMMENDED $27,730 $21,055 $6,943
198,709
kWh
$7,769
-
kW-mo/yr
$13,018
TOTAL IMPLEMENTED $27,179 $20,530 $6,665
190,796
kWh
$7,496
-
kW-mo/yr
$13,018
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs