Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

183

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Softwood veneer and plywood manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0545 #02 Y:2009 Install / repair insulation on steam lines $2,700 $4,100
OR0545 #01 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $40,900 $40,900
UF0416 #07 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $21,708 $1,477
UF0416 #06 Y:2008 Utilize higher efficiency lamps and/or ballasts $39,189 $227,490
UF0416 #05 Y:2008 Develop a repair/replace policy $5,057 -
UF0416 #04 Y:2008 Reduce the pressure of compressed air to the minimum required $5,217 -
UF0416 #03 Y:2008 Install timers and/or thermostats $53,629 $49,236
UF0416 #02 Y:2008 Utilize higher efficiency lamps and/or ballasts $70,300 $53,500
UF0416 #01 Y:2008 Repair faulty insulation in furnaces, boilers, etc $950 $4,000
OR0521 #11 Y:2007 Use or replace with energy efficient substitutes $1,900 $1,800
OR0521 #10 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $1,600 $4,500
OR0521 #09 Y:2007 Install occupancy sensors $3,720 $5,100
OR0521 #08 Y:2007 Utilize higher efficiency lamps and/or ballasts $5,250 $9,300
OR0521 #07 Y:2007 Upgrade controls on compressors $7,100 $45,000
OR0521 #06 Y:2007 Reduce the pressure of compressed air to the minimum required $7,300 -
OR0521 #05 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $9,600 $9,600
OR0521 #04 Y:2007 Turn off equipment when not in use $27,800 $12,500
OR0521 #03 Y:2007 Utilize energy-efficient belts and other improved mechanisms $27,300 -
OR0521 #02 Y:2007 Size electric motors for peak operating efficiency $37,000 $20,600
OR0521 #01 Y:2007 Flash condensate to produce lower pressure steam $92,300 $44,300