Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

207

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Hardwood veneer and plywood manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0519 #03 Y:2007 Use optimum thickness insulation $86,900 $380,160
OR0519 #02 Y:2007 Reduce excess steam bleeding $548,400 $28,000
OR0519 #01 Y:2007 Add equipment/ operators to reduce production bottleneck $5,658,000 $660,000
MS0282 #07 Y:2005 Install timers and/or thermostats $1,059 $236
MS0282 #06 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,990 $203
MS0282 #05 Y:2005 Utilize higher efficiency lamps and/or ballasts $2,337 $7,721
MS0282 #04 Y:2005 Use most efficient type of electric motors $2,467 $4,140
MS0282 #03 Y:2005 Utilize energy-efficient belts and other improved mechanisms $6,573 $11,233
MS0282 #02 Y:2005 Utilize higher efficiency lamps and/or ballasts $10,947 $22,298
MS0282 #01 Y:2005 Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $219,363 $472,500
OR0468 #12 Y:2004 Install equipment to move product $102,400 $242,000
OR0468 #11 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $14,650 $24,900
OR0468 #10 Y:2004 Turn off equipment when not in use $15,800 $26,600
OR0468 #09 Y:2004 Redesign flow to minimize mass transfer length $14,800 $15,700
OR0468 #08 Y:2004 Utilize higher efficiency lamps and/or ballasts $12,700 $13,800
OR0468 #07 Y:2004 Use most efficient type of electric motors $29,200 $27,800
OR0468 #06 Y:2004 Install occupancy sensors $3,200 $3,100
OR0468 #05 Y:2004 Redesign flow to minimize mass transfer length $72,800 $13,600
OR0468 #04 Y:2004 Upgrade controls on compressors $22,000 $1,200
OR0468 #03 Y:2004 Redesign flow to minimize mass transfer length $3,000 -