207
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Hardwood veneer and plywood manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0519 #03 Y:2007 | 03 | 2007 | Use optimum thickness insulation | $86,900 | $380,160 | |
| OR0519 #02 Y:2007 | 02 | 2007 | Reduce excess steam bleeding | $548,400 | $28,000 | |
| OR0519 #01 Y:2007 | 01 | 2007 | Add equipment/ operators to reduce production bottleneck | $5,658,000 | $660,000 | |
| MS0282 #07 Y:2005 | 07 | 2005 | Install timers and/or thermostats | $1,059 | $236 | |
| MS0282 #06 Y:2005 | 06 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,990 | $203 | |
| MS0282 #05 Y:2005 | 05 | 2005 | Utilize higher efficiency lamps and/or ballasts | $2,337 | $7,721 | |
| MS0282 #04 Y:2005 | 04 | 2005 | Use most efficient type of electric motors | $2,467 | $4,140 | |
| MS0282 #03 Y:2005 | 03 | 2005 | Utilize energy-efficient belts and other improved mechanisms | $6,573 | $11,233 | |
| MS0282 #02 Y:2005 | 02 | 2005 | Utilize higher efficiency lamps and/or ballasts | $10,947 | $22,298 | |
| MS0282 #01 Y:2005 | 01 | 2005 | Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $219,363 | $472,500 | |
| OR0468 #12 Y:2004 | 12 | 2004 | Install equipment to move product | $102,400 | $242,000 | |
| OR0468 #11 Y:2004 | 11 | 2004 | Use adjustable frequency drive or multiple speed motors on existing system | $14,650 | $24,900 | |
| OR0468 #10 Y:2004 | 10 | 2004 | Turn off equipment when not in use | $15,800 | $26,600 | |
| OR0468 #09 Y:2004 | 09 | 2004 | Redesign flow to minimize mass transfer length | $14,800 | $15,700 | |
| OR0468 #08 Y:2004 | 08 | 2004 | Utilize higher efficiency lamps and/or ballasts | $12,700 | $13,800 | |
| OR0468 #07 Y:2004 | 07 | 2004 | Use most efficient type of electric motors | $29,200 | $27,800 | |
| OR0468 #06 Y:2004 | 06 | 2004 | Install occupancy sensors | $3,200 | $3,100 | |
| OR0468 #05 Y:2004 | 05 | 2004 | Redesign flow to minimize mass transfer length | $72,800 | $13,600 | |
| OR0468 #04 Y:2004 | 04 | 2004 | Upgrade controls on compressors | $22,000 | $1,200 | |
| OR0468 #03 Y:2004 | 03 | 2004 | Redesign flow to minimize mass transfer length | $3,000 | - |