Assessment Year | 2007 |
---|---|
Principal Product | plywood |
NAICS | 321211: Hardwood Veneer and Plywood Manufacturing |
SIC | 2436: Softwood Veneer and Plywood |
Sales Range | $100 M to 500M |
# of Employees | 409 |
Plant Area |
560,000
ft2
|
Annual Production | 400,000
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,107,943 | 33,033,638 |
kWh
|
$0.034 |
Electricity Demand | $162,769 | 65,369 |
kW-mo/yr
|
$2.49 |
Natural Gas | $365,237 | 30,081 |
MMBtu
|
$12.14 |
Wood | $2,130,000 | 800,000 |
MMBtu
|
$2.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,650,150 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $779,800 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Wood Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $5,658,000 | $660,000 | - | - | - | - | - | - | - | $5,658,000 | |
02 | 2.2162: Reduce excess steam bleeding | $548,400 | $28,000 | - | - |
$201,300
-
MMBtu
|
$347,100
-
MMBtu
|
- | - | - | - | |
03 | 2.2515: Use optimum thickness insulation | $86,900 | $380,160 | - | - | - |
$86,900
-
MMBtu
|
- | - | - | - | |
04 | 2.2711: Utilize outside air instead of conditioned air for drying | $17,950 | $11,700 | - | - | - | - | - | - | $17,950 | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $16,700 | $35,900 |
$(-1,800.0)
(-49,200)
kWh
|
$(-300.0)
-
kW-mo/yr
|
$18,800
-
MMBtu
|
- | - | - | - | - | |
06 | 2.6231: Utilize controls to operate equipment only when needed | $102,000 | $33,700 |
$102,000
2,822,300
kWh
|
- | - | - | - | - | - | - | |
07 | 2.4224: Upgrade controls on compressors | $52,800 | $40,500 |
$46,800
1,293,100
kWh
|
$6,000
-
kW-mo/yr
|
- | - | - | - | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,400 | $12,400 |
$10,800
298,900
kWh
|
$1,600
-
kW-mo/yr
|
- | - | - | - | - | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $47,500 | $109,300 |
$47,500
1,314,704
kWh
|
- | - | - | - | - | - | - | |
10 | 2.4322: Use or replace with energy efficient substitutes | $42,000 | $61,300 |
$36,900
970,800
kWh
|
$5,100
-
kW-mo/yr
|
- | - | - | - | - | - | |
11 | 2.6226: Optimize filtration cleaning / replacement to minimize air resistance | $16,700 | $5,100 |
$7,900
219,000
kWh
|
$1,300
-
kW-mo/yr
|
- | - | - | $7,500 | - | - | |
12 | 2.7313: Recycle air for heating, ventilation and air conditioning | $11,500 | $16,000 |
$2,830
78,840
kWh
|
$420
-
kW-mo/yr
|
- | - | - | - | $8,250 | - | |
13 | 2.7145: Install skylights | $37,300 | $170,250 |
$24,710
683,600
kWh
|
$4,240
-
kW-mo/yr
|
- | - | $8,350 | - | - | - | |
TOTAL RECOMMENDED | $6,650,150 | $1,564,310 |
$277,640
7,632,044
kWh
|
$18,360
-
kW-mo/yr
|
$220,100
-
MMBtu
|
$434,000
-
MMBtu
|
$8,350 | $7,500 | $26,200 | $5,658,000 | ||
TOTAL IMPLEMENTED | $779,800 | $259,800 |
$205,300
5,679,804
kWh
|
$7,300
-
kW-mo/yr
|
$220,100
-
MMBtu
|
$347,100
-
MMBtu
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Wood Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs