ITAC Assessment: WI0473
ITAC logo
ITAC Assessment: WI0473
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Radiators and Intercoolers
NAICS 332410: Power Boiler and Heat Exchanger Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 123,000
ft2
Annual Production 38,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,327 1,694,880
kWh
Electricity Demand $46,973 4,508
kW-mo/yr
Electricity Fees $18,255 -
Natural Gas $163,019 21,983
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,926 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,109

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $24,462 $53,600 $13,564
384,264
kWh
$10,898
-
kW-mo/yr
-
02 2.7314: Reduce ventilation air $16,661 $32,000 - - $16,661
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $12,156 $11,000 - - $12,156
-
MMBtu
04 2.7261: Install timers and/or thermostats $1,028 $100 - - $1,028
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $619 $640 $323
9,154
kWh
$296
-
kW-mo/yr
-
TOTAL RECOMMENDED $54,926 $97,340 $13,887
393,418
kWh
$11,194
-
kW-mo/yr
$29,845
-
MMBtu
TOTAL IMPLEMENTED $26,109 $54,340 $13,887
393,418
kWh
$11,194
-
kW-mo/yr
$1,028
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs