Assessment Year | 2004 |
---|---|
Principal Product | Radiators and Intercoolers |
NAICS | 332410: Power Boiler and Heat Exchanger Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
123,000
ft2
|
Annual Production | 38,000
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,327 | 1,694,880 |
kWh
|
$0.033 |
Electricity Demand | $46,973 | 4,508 |
kW-mo/yr
|
$10.42 |
Electricity Fees | $18,255 | - |
|
- |
Natural Gas | $163,019 | 21,983 |
MMBtu
|
$7.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,926 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,109 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,462 | $53,600 |
$13,564
384,264
kWh
|
$10,898
-
kW-mo/yr
|
- | |
02 | 2.7314: Reduce ventilation air | $16,661 | $32,000 | - | - |
$16,661
-
MMBtu
|
|
03 | 2.2414: Use waste heat from hot flue gases to preheat | $12,156 | $11,000 | - | - |
$12,156
-
MMBtu
|
|
04 | 2.7261: Install timers and/or thermostats | $1,028 | $100 | - | - |
$1,028
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $619 | $640 |
$323
9,154
kWh
|
$296
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $54,926 | $97,340 |
$13,887
393,418
kWh
|
$11,194
-
kW-mo/yr
|
$29,845
-
MMBtu
|
||
TOTAL IMPLEMENTED | $26,109 | $54,340 |
$13,887
393,418
kWh
|
$11,194
-
kW-mo/yr
|
$1,028
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs