ITAC Assessment: MZ0126
ITAC logo
ITAC Assessment: MZ0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Recycled metals
NAICS 331314: Secondary Smelting and Alloying of Aluminum
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 41
Plant Area 653,400
ft2
Annual Production 10,000
ton
Production Hrs. Annual 2,210
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,963 3,076,484
kWh
Electricity Demand $254,056 33,069
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,299 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,501

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,531 $32,100 $3,653
92,960
kWh
$3,878
-
kW-mo/yr
02 2.7135: Install occupancy sensors $3,501 $780 $3,501
89,073
kWh
-
03 2.2437: Recover waste heat from equipment $1,939 $770 $941
23,947
kWh
$998
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $328 $575 $159
4,054
kWh
$169
-
kW-mo/yr
TOTAL RECOMMENDED $13,299 $34,225 $8,254
210,034
kWh
$5,045
-
kW-mo/yr
TOTAL IMPLEMENTED $3,501 $780 $3,501
89,073
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs