Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

202

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Hardwood veneer and plywood manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0794 #05 Y:2008 Utilize controls to operate equipment only when needed $7,981 $19,425
UD0794 #04 Y:2008 Upgrade controls on compressors $9,841 $10,000
UD0794 #03 Y:2008 Use plant owned transformers or lease transformers $20,779 $50,000
UD0794 #02 Y:2008 Reschedule plant operations or reduce load to avoid peaks $46,758 -
UD0794 #01 Y:2008 Redesign process $60,982 $300,000
OR0519 #13 Y:2007 Install skylights $37,300 $170,250
OR0519 #12 Y:2007 Recycle air for heating, ventilation and air conditioning $11,500 $16,000
OR0519 #11 Y:2007 Optimize filtration cleaning / replacement to minimize air resistance $16,700 $5,100
OR0519 #10 Y:2007 Use or replace with energy efficient substitutes $42,000 $61,300
OR0519 #09 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $47,500 $109,300
OR0519 #08 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $12,400 $12,400
OR0519 #07 Y:2007 Upgrade controls on compressors $52,800 $40,500
OR0519 #06 Y:2007 Utilize controls to operate equipment only when needed $102,000 $33,700
OR0519 #05 Y:2007 Use waste heat from hot flue gases to preheat $16,700 $35,900
OR0519 #04 Y:2007 Utilize outside air instead of conditioned air for drying $17,950 $11,700
OR0519 #03 Y:2007 Use optimum thickness insulation $86,900 $380,160
OR0519 #02 Y:2007 Reduce excess steam bleeding $548,400 $28,000
OR0519 #01 Y:2007 Add equipment/ operators to reduce production bottleneck $5,658,000 $660,000
MS0282 #07 Y:2005 Install timers and/or thermostats $1,059 $236
MS0282 #06 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,990 $203