202
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Hardwood veneer and plywood manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0794 #05 Y:2008 | 05 | 2008 | Utilize controls to operate equipment only when needed | $7,981 | $19,425 | |
| UD0794 #04 Y:2008 | 04 | 2008 | Upgrade controls on compressors | $9,841 | $10,000 | |
| UD0794 #03 Y:2008 | 03 | 2008 | Use plant owned transformers or lease transformers | $20,779 | $50,000 | |
| UD0794 #02 Y:2008 | 02 | 2008 | Reschedule plant operations or reduce load to avoid peaks | $46,758 | - | |
| UD0794 #01 Y:2008 | 01 | 2008 | Redesign process | $60,982 | $300,000 | |
| OR0519 #13 Y:2007 | 13 | 2007 | Install skylights | $37,300 | $170,250 | |
| OR0519 #12 Y:2007 | 12 | 2007 | Recycle air for heating, ventilation and air conditioning | $11,500 | $16,000 | |
| OR0519 #11 Y:2007 | 11 | 2007 | Optimize filtration cleaning / replacement to minimize air resistance | $16,700 | $5,100 | |
| OR0519 #10 Y:2007 | 10 | 2007 | Use or replace with energy efficient substitutes | $42,000 | $61,300 | |
| OR0519 #09 Y:2007 | 09 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $47,500 | $109,300 | |
| OR0519 #08 Y:2007 | 08 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,400 | $12,400 | |
| OR0519 #07 Y:2007 | 07 | 2007 | Upgrade controls on compressors | $52,800 | $40,500 | |
| OR0519 #06 Y:2007 | 06 | 2007 | Utilize controls to operate equipment only when needed | $102,000 | $33,700 | |
| OR0519 #05 Y:2007 | 05 | 2007 | Use waste heat from hot flue gases to preheat | $16,700 | $35,900 | |
| OR0519 #04 Y:2007 | 04 | 2007 | Utilize outside air instead of conditioned air for drying | $17,950 | $11,700 | |
| OR0519 #03 Y:2007 | 03 | 2007 | Use optimum thickness insulation | $86,900 | $380,160 | |
| OR0519 #02 Y:2007 | 02 | 2007 | Reduce excess steam bleeding | $548,400 | $28,000 | |
| OR0519 #01 Y:2007 | 01 | 2007 | Add equipment/ operators to reduce production bottleneck | $5,658,000 | $660,000 | |
| MS0282 #07 Y:2005 | 07 | 2005 | Install timers and/or thermostats | $1,059 | $236 | |
| MS0282 #06 Y:2005 | 06 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,990 | $203 |