Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

681

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0120 #04 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $223 $22
IP0120 #03 Y:2019 Turn off equipment during breaks, reduce operating time $348 -
IP0120 #02 Y:2019 Conserve energy by efficient use of vending machines $835 -
IP0120 #01 Y:2019 Reduce the pressure of compressed air to the minimum required $1,145 $4
OR0718 #03 Y:2019 Ventilation system to shut off when room is not in use $7,386 $27,337
OR0718 #02 Y:2019 Turn off equipment during breaks, reduce operating time $47,893 $5,142
OR0718 #01 Y:2019 Use waste heat from hot flue gases to preheat $84,306 $71,155
NC0628 #06 Y:2018 Optimize plant power factor $785 $1,500
NC0628 #05 Y:2018 Size electric motors for peak operating efficiency $29,932 $120,000
NC0628 #04 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $26,500 $70,000
NC0628 #03 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $580 $200
NC0628 #02 Y:2018 Install occupancy sensors $45 $100
NC0628 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $4,628 $15,967
NC0624 #05 Y:2018 Repair furnaces and oven doors so that they seal efficiently $9,555 $2,000
NC0624 #04 Y:2018 Avoid rewinding motors more than twice $39,622 $58,313
NC0624 #03 Y:2018 Reduce the pressure of compressed air to the minimum required $107 $450
NC0624 #02 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $5,403 $200
NC0624 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $37,704 $24,212
OK0989 #05 Y:2018 Replace existing hvac unit with high efficiency model $616 $5,983
OK0989 #04 Y:2018 Utilize higher efficiency lamps and/or ballasts $4,730 $13,456