Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

692

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2602 #06 Y:2026 Optimize plant power factor $61,576 $37,084
UW2602 #05 Y:2026 Repair and eliminate steam leaks $38,800 $7,287
UW2602 #04 Y:2026 Use or replace with energy efficient substitutes $10,764 $32,940
UW2602 #03 Y:2026 Install occupancy sensors $20,293 $15,688
UW2602 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $6,269 $7,520
UW2602 #01 Y:2026 Burn wood by-products for heat $362,644 $6,038,074
OR0825 #05 Y:2026 Add equipment/ operators to reduce production bottleneck $37,391 $265,330
OR0825 #04 Y:2026 Use most efficient type of electric motors $5,237 $1,136
OR0825 #03 Y:2026 Eliminate or reduce compressed air usage $1,412 $163
OR0825 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $3,425 -
OR0825 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $10,124 -
WM0252 #05 Y:2025 Reduce space conditioning during non-working hours $399 $3,550
WM0252 #04 Y:2025 Install compressor air intakes in coolest locations $566 $3,607
WM0252 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $692 -
WM0252 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,152 $4,060
WM0252 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,906 $17,664
UD1107 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,839 $5,280
UD1107 #04 Y:2025 Eliminate or reduce compressed air usage $412 $900
UD1107 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,345 $953
UD1107 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $69,274 -