714
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AS0621 #09 Y:2026 | 09 | 2026 | Install compressor air intakes in coolest locations | $224 | $1,573 |
n/a
|
| AS0621 #08 Y:2026 | 08 | 2026 | Conserve energy by efficient use of vending machines | $1,381 | $547 |
n/a
|
| AS0621 #07 Y:2026 | 07 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,673 | $516 |
n/a
|
| AS0621 #06 Y:2026 | 06 | 2026 | Install timers and/or thermostats | $1,823 | $1,826 |
n/a
|
| AS0621 #05 Y:2026 | 05 | 2026 | Turn off equipment when not in use | $1,828 | $62 |
n/a
|
| AS0621 #04 Y:2026 | 04 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $2,939 | $11,910 |
n/a
|
| AS0621 #03 Y:2026 | 03 | 2026 | Utilize controls to operate equipment only when needed | $3,915 | $2,204 |
n/a
|
| AS0621 #02 Y:2026 | 02 | 2026 | Utilize higher efficiency lamps and/or ballasts | $5,397 | $7,852 |
n/a
|
| AS0621 #01 Y:2026 | 01 | 2026 | Upgrade obsolete equipment | $81,446 | $350,000 |
n/a
|
| OR0828 #06 Y:2026 | 06 | 2026 | Use solar heat to make electricty | $56,750 | $1,165,500 |
n/a
|
| OR0828 #05 Y:2026 | 05 | 2026 | Use or replace with energy efficient substitutes | $1,343,099 | $12,894,730 |
n/a
|
| OR0828 #04 Y:2026 | 04 | 2026 | Optimize plant power factor | $2,860 | $21,699 |
n/a
|
| OR0828 #03 Y:2026 | 03 | 2026 | Modify process to reduce material use/cost | $34,756 | $10,000 |
n/a
|
| OR0828 #02 Y:2026 | 02 | 2026 | Add equipment/ operators to reduce production bottleneck | $12,537 | $2,000 |
n/a
|
| OR0828 #01 Y:2026 | 01 | 2026 | Eliminate or reduce compressed air usage | $4,401 | $50 |
n/a
|
| OR0827 #07 Y:2026 | 07 | 2026 | Use solar heat to make electricty | $34,776 | $858,220 |
n/a
|
| OR0827 #06 Y:2026 | 06 | 2026 | Optimize plant power factor | $7,574 | $55,435 |
n/a
|
| OR0827 #05 Y:2026 | 05 | 2026 | Cover open tanks | $1,065 | $184 |
n/a
|
| OR0827 #04 Y:2026 | 04 | 2026 | Recover waste heat from equipment | $78,209 | $1,612 |
n/a
|
| OR0827 #03 Y:2026 | 03 | 2026 | Use optimum size and capacity equipment | $2,702,540 | $32,000 |
n/a
|