Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

714

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0621 #09 Y:2026 Install compressor air intakes in coolest locations $224 $1,573
AS0621 #08 Y:2026 Conserve energy by efficient use of vending machines $1,381 $547
AS0621 #07 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,673 $516
AS0621 #06 Y:2026 Install timers and/or thermostats $1,823 $1,826
AS0621 #05 Y:2026 Turn off equipment when not in use $1,828 $62
AS0621 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $2,939 $11,910
AS0621 #03 Y:2026 Utilize controls to operate equipment only when needed $3,915 $2,204
AS0621 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $5,397 $7,852
AS0621 #01 Y:2026 Upgrade obsolete equipment $81,446 $350,000
OR0828 #06 Y:2026 Use solar heat to make electricty $56,750 $1,165,500
OR0828 #05 Y:2026 Use or replace with energy efficient substitutes $1,343,099 $12,894,730
OR0828 #04 Y:2026 Optimize plant power factor $2,860 $21,699
OR0828 #03 Y:2026 Modify process to reduce material use/cost $34,756 $10,000
OR0828 #02 Y:2026 Add equipment/ operators to reduce production bottleneck $12,537 $2,000
OR0828 #01 Y:2026 Eliminate or reduce compressed air usage $4,401 $50
OR0827 #07 Y:2026 Use solar heat to make electricty $34,776 $858,220
OR0827 #06 Y:2026 Optimize plant power factor $7,574 $55,435
OR0827 #05 Y:2026 Cover open tanks $1,065 $184
OR0827 #04 Y:2026 Recover waste heat from equipment $78,209 $1,612
OR0827 #03 Y:2026 Use optimum size and capacity equipment $2,702,540 $32,000