692
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UW2602 #06 Y:2026 | 06 | 2026 | Optimize plant power factor | $61,576 | $37,084 |
n/a
|
| UW2602 #05 Y:2026 | 05 | 2026 | Repair and eliminate steam leaks | $38,800 | $7,287 |
n/a
|
| UW2602 #04 Y:2026 | 04 | 2026 | Use or replace with energy efficient substitutes | $10,764 | $32,940 |
n/a
|
| UW2602 #03 Y:2026 | 03 | 2026 | Install occupancy sensors | $20,293 | $15,688 |
n/a
|
| UW2602 #02 Y:2026 | 02 | 2026 | Utilize higher efficiency lamps and/or ballasts | $6,269 | $7,520 |
n/a
|
| UW2602 #01 Y:2026 | 01 | 2026 | Burn wood by-products for heat | $362,644 | $6,038,074 |
n/a
|
| OR0825 #05 Y:2026 | 05 | 2026 | Add equipment/ operators to reduce production bottleneck | $37,391 | $265,330 |
n/a
|
| OR0825 #04 Y:2026 | 04 | 2026 | Use most efficient type of electric motors | $5,237 | $1,136 |
n/a
|
| OR0825 #03 Y:2026 | 03 | 2026 | Eliminate or reduce compressed air usage | $1,412 | $163 |
n/a
|
| OR0825 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $3,425 | - |
n/a
|
| OR0825 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,124 | - |
n/a
|
| WM0252 #05 Y:2025 | 05 | 2025 | Reduce space conditioning during non-working hours | $399 | $3,550 |
n/a
|
| WM0252 #04 Y:2025 | 04 | 2025 | Install compressor air intakes in coolest locations | $566 | $3,607 |
n/a
|
| WM0252 #03 Y:2025 | 03 | 2025 | Reduce the pressure of compressed air to the minimum required | $692 | - |
n/a
|
| WM0252 #02 Y:2025 | 02 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $1,152 | $4,060 |
n/a
|
| WM0252 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,906 | $17,664 |
n/a
|
| UD1107 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $2,839 | $5,280 | |
| UD1107 #04 Y:2025 | 04 | 2025 | Eliminate or reduce compressed air usage | $412 | $900 | |
| UD1107 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,345 | $953 | |
| UD1107 #02 Y:2025 | 02 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $69,274 | - |