Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

662

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0020 #08 Y:2024 Replace fossil fuel equipment with electrical equipment $2,868 $15,989
SJ0020 #07 Y:2024 Convert combustion equipment to burn natural gas $2,380 -
SJ0020 #06 Y:2024 Lower temperature during the winter season and vice-versa $2,851 -
SJ0020 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $1,344 -
SJ0020 #04 Y:2024 Install occupancy sensors $178 $770
SJ0020 #03 Y:2024 Install occupancy sensors $156 $358
SJ0020 #02 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $23,898 $9,577
SJ0020 #01 Y:2024 Use solar heat to make electricty $140,348 $663,784
UL2403 #09 Y:2024 Use solar heat to make electricty $53,533 $548,395
UL2403 #08 Y:2024 Install spectral reflectors / delamp $680 -
UL2403 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,568 $3,839
UL2403 #06 Y:2024 Install occupancy sensors $181 $779
UL2403 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,498 $1,785
UL2403 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $1,803 -
UL2403 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $3,407 $9,750
UL2403 #02 Y:2024 Optimize plant power factor $32,359 $12,025
UL2403 #01 Y:2024 Recover waste heat from equipment $35,606 $77,327
SJ0014 #08 Y:2023 Utilize higher efficiency lamps and/or ballasts $564 $336
SJ0014 #07 Y:2023 Insulate bare equipment $22,822 $3,080
SJ0014 #06 Y:2023 Eliminate or reduce compressed air usage $2,018 -