Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

721

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Veneer, plywood, and engineered wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2616 #07 Y:2026 Install waste heat boiler to produce steam $2,606 $11,000
UL2616 #06 Y:2026 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,404 $720
UL2616 #05 Y:2026 Use solar heat to make electricty $29,169 $222,999
UL2616 #04 Y:2026 Install / repair insulation on steam lines $30 $80
UL2616 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,932 $3,420
UL2616 #02 Y:2026 Upgrade conveyors $730 $1,050
UL2616 #01 Y:2026 Close holes and openings in building such as broken windows $3,302 $870
AS0621 #09 Y:2026 Install compressor air intakes in coolest locations $224 $1,573
AS0621 #08 Y:2026 Conserve energy by efficient use of vending machines $1,381 $547
AS0621 #07 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,673 $516
AS0621 #06 Y:2026 Install timers and/or thermostats $1,823 $1,826
AS0621 #05 Y:2026 Turn off equipment when not in use $1,828 $62
AS0621 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $2,939 $11,910
AS0621 #03 Y:2026 Utilize controls to operate equipment only when needed $3,915 $2,204
AS0621 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $5,397 $7,852
AS0621 #01 Y:2026 Upgrade obsolete equipment $81,446 $350,000
OR0828 #06 Y:2026 Use solar heat to make electricty $56,750 $1,165,500
OR0828 #05 Y:2026 Use or replace with energy efficient substitutes $2,095,860 $12,883,197
OR0828 #04 Y:2026 Optimize plant power factor $2,860 $21,699
OR0828 #03 Y:2026 Modify process to reduce material use/cost $14,774 $10,000