Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Sawmills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0223 #04 Y:2019 Install / repair insulation on steam lines $1,536 $3,806
UA0223 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $1,686 $250
UA0223 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $1,828 $1,395
UA0223 #01 Y:2019 Utilize energy-efficient belts and other improved mechanisms $965 $562
OR0729 #05 Y:2019 Use solar heat to make electricty $34,870 $566,544
OR0729 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $4,586 $8,701
OR0729 #03 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $12,791 $13,791
OR0729 #02 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $8,737 $17,500
OR0729 #01 Y:2019 Optimize plant power factor $14,812 $38,672
BS0122 #07 Y:2019 Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $322,973 $1,002,400
BS0122 #06 Y:2019 Burn a less expensive grade of fuel $105,689 $93,600
BS0122 #05 Y:2019 Utilize controls to operate equipment only when needed $2,219 $5,725
BS0122 #04 Y:2019 Utilize controls to operate equipment only when needed $882 $15
BS0122 #03 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $3,341 $1,630
BS0122 #02 Y:2019 Reduce the pressure of compressed air to the minimum required $13,702 $8,000
BS0122 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $10,031 $14,455