ITAC Assessment: BS0122
ITAC logo
ITAC Assessment: BS0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $100
M
to 500
M
# of Employees 185
Plant Area 5,690,341
ft2
Annual Production 256,000
thousand feet
Production Hrs. Annual 4,807
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $905,874 27,380,507
kWh
Electricity Demand $161,835 49,927
kW-mo/yr
Natural Gas $237,930 59,286
MMBtu
Waste Disposal Costs
Water Usage $31,968 13,028
Tgal
TOTAL YEARLY COSTS $1,337,606
RECOMMENDED SAVINGS* $458,837 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,031 $14,455 $8,051
243,984
kWh
$1,979
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $13,702 $8,000 $4,777
144,759
kWh
$8,925
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,341 $1,630 $2,407
72,971
kWh
$934
-
kW-mo/yr
-
04 2.6231: Utilize controls to operate equipment only when needed $882 $15 $882
26,710
kWh
- -
05 2.6231: Utilize controls to operate equipment only when needed $2,219 $5,725 $2,219
69,432
kWh
- -
06 2.1331: Burn a less expensive grade of fuel $105,689 $93,600 - - $105,689
-
MMBtu
07 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $322,973 $1,002,400 $322,973
9,825,508
kWh
- -
TOTAL RECOMMENDED $458,837 $1,125,825 $341,310
10,383,364
kWh
$11,838
-
kW-mo/yr
$105,689
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs