ITAC Assessment: OR0729
ITAC logo
ITAC Assessment: OR0729
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Specialty Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 830,000
ft2
Annual Production 6,300
thousand feet
Production Hrs. Annual 2,320
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,824 1,628,080
kWh
Electricity Demand $90,973 11,663
kW-mo/yr
Electricity Fees $4,028 -
TOTAL YEARLY COSTS $186,825
RECOMMENDED SAVINGS* $75,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,603

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Primary Raw Material Savings
01 2.3212: Optimize plant power factor $14,812 $38,672 - - $14,812 - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,737 $17,500 $8,737
126,544
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,791 $13,791 $7,597
118,856
kWh
$5,194
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,586 $8,701 $2,752
43,057
kWh
$1,433
-
kW-mo/yr
- $316 $85
05 2.9114: Use solar heat to make electricty $34,870 $566,544 $34,870
545,524
kWh
- - - -
TOTAL RECOMMENDED $75,796 $645,208 $53,956
833,981
kWh
$6,627
-
kW-mo/yr
$14,812 $316 $85
TOTAL IMPLEMENTED $27,603 $52,463 $7,597
118,856
kWh
$5,194
-
kW-mo/yr
$14,812 - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs