ITAC Assessment: UA0223
ITAC logo
ITAC Assessment: UA0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Rough sawn lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 49
Plant Area 958,320
ft2
Annual Production 1,500
thousand feet
Production Hrs. Annual 2,340
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,197 1,420,415
kWh
Electricity Demand $59,052 8,681
kW-mo/yr
Electricity Fees $24,241 -
Wood $65,315 38,478
MMBtu
Waste Disposal Costs
Water Usage $6,518 1,384
Tgal
TOTAL YEARLY COSTS $230,323
RECOMMENDED SAVINGS* $6,015 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,793

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $965 $562 $462
8,727
kWh
$355
-
kW-mo/yr
$148 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,828 $1,395 $1,222
23,092
kWh
$326
-
kW-mo/yr
$280 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,686 $250 $989
18,680
kWh
$439
-
kW-mo/yr
$258 -
04 2.2136: Install / repair insulation on steam lines $1,536 $3,806 - - - $1,536
-
MMBtu
TOTAL RECOMMENDED $6,015 $6,013 $2,673
50,499
kWh
$1,120
-
kW-mo/yr
$686 $1,536
-
MMBtu
TOTAL IMPLEMENTED $2,793 $1,957 $1,684
31,819
kWh
$681
-
kW-mo/yr
$428 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs