Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Sawmills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0744 #02 Y:2017 Utilize energy-efficient belts and other improved mechanisms $7,640 -
AM0744 #01 Y:2017 Begin a practice of predictive / preventative maintenance $17,930 $4,570
AM0739 #08 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $540 $300
AM0739 #07 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $730 $300
AM0739 #06 Y:2017 Turn off equipment when not in use $1,870 -
AM0739 #05 Y:2017 Use synthetic lubricant $2,400 -
AM0739 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $6,820 $9,600
AM0739 #03 Y:2017 Utilize energy-efficient belts and other improved mechanisms $7,430 -
AM0739 #02 Y:2017 Optimize plant power factor $17,900 $28,900
AM0739 #01 Y:2017 Eliminate or reduce compressed air usage $44,300 $31,800
TA0090 #07 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $280 $120
TA0090 #06 Y:2004 Reduce the pressure of compressed air to the minimum required $910 $8
TA0090 #05 Y:2004 Regrind, reuse, or sell scrap plastic parts $1,920 $120
TA0090 #04 Y:2004 Adopt in-house material generation $2,350 -
TA0090 #03 Y:2004 Replace existing equipment with more suitable substitutes $23,490 $45,000
TA0090 #02 Y:2004 Replace existing equipment with more suitable substitutes $42,810 $64,000
TA0090 #01 Y:2004 Condense operation into one building $91,320 $20,000