ITAC Assessment: AM0739
ITAC logo
ITAC Assessment: AM0739
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Processed lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $50
M
to 100
M
# of Employees 68
Plant Area 100,000
ft2
Annual Production 30,000
thousand feet
Production Hrs. Annual 2,636
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,669 2,413,330
kWh
Electricity Demand $83,299 10,070
kW-mo/yr
Electricity Fees $315 -
Natural Gas $67,274 15,918
MMBtu
TOTAL YEARLY COSTS $270,557
RECOMMENDED SAVINGS* $81,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4239: Eliminate or reduce compressed air usage $44,300 $31,800 $18,200
364,800
kWh
$26,100
-
kW-mo/yr
02 2.3212: Optimize plant power factor $17,900 $28,900 - $17,900
-
kW-mo/yr
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,430 - $3,310
66,200
kWh
$4,120
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,820 $9,600 $3,480
69,600
kWh
$3,340
-
kW-mo/yr
05 2.4314: Use synthetic lubricant $2,400 - $1,200
23,800
kWh
$1,200
-
kW-mo/yr
06 2.6218: Turn off equipment when not in use $1,870 - $1,870
37,300
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $730 $300 $370
7,420
kWh
$360
-
kW-mo/yr
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $540 $300 $275
5,500
kWh
$265
-
kW-mo/yr
TOTAL RECOMMENDED $81,990 $70,900 $28,705
574,620
kWh
$53,285
-
kW-mo/yr
TOTAL IMPLEMENTED $62,220 $42,000 $26,835
537,320
kWh
$35,385
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs