| Assessment Year | 2018 |
|---|---|
| Principal Product | Processed lumber |
| NAICS | 321113: Sawmills |
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $100 M to 500M |
| # of Employees | 420 |
| Plant Area |
125,000
ft2
|
| Annual Production | 2,000
thousand feet
|
| Production Hrs. Annual | 7,748
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $286,116 | 4,628,400 |
kWh
|
$0.062 |
| Electricity Demand | $80,500 | 13,362 |
kW-mo/yr
|
$6.02 |
| Electricity Fees | $769 | - |
|
- |
| TOTAL YEARLY COSTS | $367,385 | |||
| RECOMMENDED SAVINGS* | $52,222 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $43,383 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.611: Begin a practice of predictive / preventative maintenance | $17,930 | $4,570 |
$3,960
64,060
kWh
|
$1,500
-
kW-mo/yr
|
- | $12,470 | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,640 | - |
$5,730
92,670
kWh
|
$1,910
-
kW-mo/yr
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,150 | $5,000 |
$5,770
93,340
kWh
|
$1,380
-
kW-mo/yr
|
- | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,840 | $225 |
$4,700
76,060
kWh
|
$1,140
-
kW-mo/yr
|
- | - | |
| 05 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $4,800 | - | - | - |
$4,800
-
lb
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,928 | $7,060 |
$4,260
68,900
kWh
|
$668
-
kW-mo/yr
|
- | - | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $1,880 | $560 |
$1,880
30,460
kWh
|
- | - | - | |
| 08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,119 | $1,800 |
$794
12,850
kWh
|
$325
-
kW-mo/yr
|
- | - | |
| 09 | 2.7134: Use photocell controls | $935 | $180 |
$935
15,130
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $52,222 | $19,395 |
$28,029
453,470
kWh
|
$6,923
-
kW-mo/yr
|
$4,800
-
lb
|
$12,470 | ||
| TOTAL IMPLEMENTED | $43,383 | $16,810 |
$20,655
334,100
kWh
|
$5,458
-
kW-mo/yr
|
$4,800
-
lb
|
$12,470 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs