| Assessment Year | 2004 |
|---|---|
| Principal Product | Saw Cut Lumber and Crates |
| NAICS | 321113: Sawmills |
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $50 M to 100M |
| # of Employees | 100 |
| Plant Area |
23,000
ft2
|
| Annual Production | 63,000
thousand feet
|
| Production Hrs. Annual | 2,379
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $46,943 | 620,480 |
kWh
|
$0.076 |
| Electricity Demand | $8,277 | 4,244 |
kW-mo/yr
|
$1.95 |
| Electricity Fees | $300 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $163,080 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $280 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Product Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.512: Condense operation into one building | $91,320 | $20,000 | - | - | $31,320 | $60,000 | - | |
| 02 | 4.652: Replace existing equipment with more suitable substitutes | $42,810 | $64,000 | - | - | $42,810 | - | - | |
| 03 | 4.652: Replace existing equipment with more suitable substitutes | $23,490 | $45,000 | - | - | $23,490 | - | - | |
| 04 | 4.212: Adopt in-house material generation | $2,350 | - | - | - | - | - | $2,350 | |
| 05 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $1,920 | $120 | - |
$1,920
-
lb
|
- | - | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $910 | $8 |
$910
10,872
kWh
|
- | - | - | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $280 | $120 |
$280
3,367
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $163,080 | $129,248 |
$1,190
14,239
kWh
|
$1,920
-
lb
|
$97,620 | $60,000 | $2,350 | ||
| TOTAL IMPLEMENTED | $280 | $120 |
$280
3,367
kWh
|
- | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Product Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs