ITAC Assessment: ST0032
ITAC logo
ITAC Assessment: ST0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product FABRICATED STEEL
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $1
M
to 5
M
# of Employees 36
Plant Area
n/a
Annual Production 2,500
ton
Production Hrs. Annual 0
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,890 170,281
kWh
Natural Gas $735 81
MMBtu
Fuel Oil #1 $7,920 679
MMBtu
Fuel Oil #2 $4,021 482
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,694 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,404

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $514 $64 $514
4,103
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $72 $42 $72
586
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,640 $688 $1,640
13,482
kWh
- -
04 2.3191: Use demand controller or load shedder $890 $1,900 $890
-
kWh
- -
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,974 $900 $1,974
16,120
kWh
- -
06 2.3311: Replace dc equipment with ac equipment $2,416 $5,000 $2,416
19,637
kWh
- -
07 2.6121: Reduce hot water temperature to the minimum required $305 - $305
2,638
kWh
- -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $380 $1,140 $550
4,396
kWh
$(-170.0)
-
MMBtu
-
09 2.1233: Analyze flue gas for proper air/fuel ratio $503 $380 - - $503
-
MMBtu
TOTAL RECOMMENDED $8,694 $10,114 $8,361
60,962
kWh
$(-170.0)
-
MMBtu
$503
-
MMBtu
TOTAL IMPLEMENTED $1,404 $1,964 $1,404
4,103
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs