Assessment Year | 1999 |
---|---|
Principal Product | Assembly and Sequencing |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $1 M to 5M |
# of Employees | 66 |
Plant Area |
55,000
ft2
|
Annual Production | 1,200,000
pieces
|
Production Hrs. Annual | 4,675
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $28,344 | 1,030,774 |
kWh
|
$0.027 |
Electricity Demand | $38,189 | 2,124 |
kW-mo/yr
|
$17.98 |
Electricity Fees | $7,619 | - |
|
- |
Natural Gas | $15,256 | 2,968 |
MMBtu
|
$5.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $113,688 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $113,688 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $5,007 | $450 |
$2,271
81,477
kWh
|
$2,736
-
kW-mo/yr
|
- | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $5,592 | $165 |
$5,592
210,434
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,361 | $1,200 |
$1,950
65,944
kWh
|
$2,411
-
kW-mo/yr
|
- | - | - | |
04 | 2.7291: Reschedule and rearrange multiple-source heating systems | $6,852 | $500 | - | - |
$6,852
-
MMBtu
|
- | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,465 | $1,500 | - | - |
$1,465
-
MMBtu
|
- | - | |
06 | 2.7229: Air condition only space necessary | $12,009 | $2,000 |
$2,513
89,683
kWh
|
$3,215
-
kW-mo/yr
|
$6,281
-
MMBtu
|
- | - | |
07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $7,277 | - | - | - | - |
$7,277
-
lb
|
- | |
08 | 3.5316: Contract a wood pallet recycling company | $1,125 | - | - | - | - |
$1,125
-
lb
|
- | |
09 | 4.111: Add equipment/ operators to reduce production bottleneck | $70,000 | $50,000 | - | - | - | - | $70,000 | |
TOTAL RECOMMENDED | $113,688 | $55,815 |
$12,326
447,538
kWh
|
$8,362
-
kW-mo/yr
|
$14,598
-
MMBtu
|
$8,402
-
lb
|
$70,000 | ||
TOTAL IMPLEMENTED | $113,688 | $55,815 |
$12,326
447,538
kWh
|
$8,362
-
kW-mo/yr
|
$14,598
-
MMBtu
|
$8,402
-
lb
|
$70,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs