Assessment Year | 2014 |
---|---|
Principal Product | Gravure Printed Labels |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2754: Commercial Printing, Gravure |
Sales Range | $10 M to 50M |
# of Employees | 43 |
Plant Area |
100,000
ft2
|
Annual Production | 20,824,384
units
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $114,583 | 3,805,585 |
kWh
|
$0.030 |
Electricity Demand | $17,402 | 5,524 |
kW-mo/yr
|
$3.15 |
Electricity Fees | $6,391 | - |
|
- |
Natural Gas | $164,950 | 28,006 |
MMBtu
|
$5.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,782 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,902 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $509 | - |
$509
16,954
kWh
|
- | - | |
02 | 2.7135: Install occupancy sensors | $1,140 | $521 |
$1,140
38,010
kWh
|
- | - | |
03 | 2.7122: Disconnect ballasts | $96 | - |
$96
3,192
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,080 | $749 |
$1,080
36,010
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,211 | $1,388 |
$2,211
73,712
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $595 | $532 |
$102
3,421
kWh
|
$15
-
kW-mo/yr
|
$478 | |
07 | 3.1161: Eliminate/reduce an operation | $1,151 | $1,668 | - | - | $1,151 | |
TOTAL RECOMMENDED | $6,782 | $4,858 |
$5,138
171,299
kWh
|
$15
-
kW-mo/yr
|
$1,629 | ||
TOTAL IMPLEMENTED | $2,902 | $1,920 |
$2,409
80,325
kWh
|
$15
-
kW-mo/yr
|
$478 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs