Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Gravure Printed Labels
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2754: Commercial Printing, Gravure
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 100,000
ft2
Annual Production 20,824,384
units
Production Hrs. Annual 8,400
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,583 3,805,585
kWh
Electricity Demand $17,402 5,524
kW-mo/yr
Electricity Fees $6,391 -
Natural Gas $164,950 28,006
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,782 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,902

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $509 - $509
16,954
kWh
- -
02 2.7135: Install occupancy sensors $1,140 $521 $1,140
38,010
kWh
- -
03 2.7122: Disconnect ballasts $96 - $96
3,192
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,080 $749 $1,080
36,010
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,211 $1,388 $2,211
73,712
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $595 $532 $102
3,421
kWh
$15
-
kW-mo/yr
$478
07 3.1161: Eliminate/reduce an operation $1,151 $1,668 - - $1,151
TOTAL RECOMMENDED $6,782 $4,858 $5,138
171,299
kWh
$15
-
kW-mo/yr
$1,629
TOTAL IMPLEMENTED $2,902 $1,920 $2,409
80,325
kWh
$15
-
kW-mo/yr
$478
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs