ITAC Assessment: SD0348
ITAC logo
ITAC Assessment: SD0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product CDs and DVDs
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 60,000
ft2
Annual Production 28,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,394 1,956,180
kWh
Electricity Demand $66,418 4,353
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,166 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Raw Material Savings Primary Product Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $12,921 $12,655 $8,816
93,985
kWh
$4,105
-
kW-mo/yr
- - -
02 2.4322: Use or replace with energy efficient substitutes $1,682 $2,600 $995
10,612
kWh
$687
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,371 $747 $1,371
14,622
kWh
- - - -
04 2.7134: Use photocell controls $1,538 $1,720 $1,538
9,715
kWh
- - - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,553 $18,500 - - $5,553
-
lb
- -
06 4.211: Consider use / purchase of bulk materials where possible $70,166 $43,083 - - - $70,166 -
07 4.441: Install automatic packing equipment $2,935 $3,500 - - - - $2,935
TOTAL RECOMMENDED $96,166 $82,805 $12,720
128,934
kWh
$4,792
-
kW-mo/yr
$5,553
-
lb
$70,166 $2,935
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs