3,231
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CC0036 #07 Y:2024 | 07 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $74,792 | $250,000 |
n/a
|
| CC0036 #06 Y:2024 | 06 | 2024 | Reduce the pressure of compressed air to the minimum required | $3,222 | $10,000 |
n/a
|
| CC0036 #05 Y:2024 | 05 | 2024 | Recover waste heat from equipment | $3,480 | $10,000 |
n/a
|
| CC0036 #04 Y:2024 | 04 | 2024 | Utilize higher efficiency lamps and/or ballasts | $3,953 | $3,987 |
n/a
|
| CC0036 #03 Y:2024 | 03 | 2024 | Use most efficient type of electric motors | $351 | $1,191 |
n/a
|
| CC0036 #02 Y:2024 | 02 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $22,612 | $12,962 |
n/a
|
| CC0036 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $46,974 | $309,771 |
n/a
|
| WV0657 #10 Y:2024 | 10 | 2024 | Eliminate or reduce compressed air usage | $486 | $242 | |
| WV0657 #09 Y:2024 | 09 | 2024 | Develop a repair/replace policy | $1,429 | $6,850 | |
| WV0657 #08 Y:2024 | 08 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,181 | $1,063 | |
| WV0657 #07 Y:2024 | 07 | 2024 | Analyze flue gas for proper air/fuel ratio | $2,266 | $1,107 | |
| WV0657 #06 Y:2024 | 06 | 2024 | Insulate bare equipment | $2,493 | $1,302 | |
| WV0657 #05 Y:2024 | 05 | 2024 | Establish a predictive maintenance program | $4,482 | $1,500 | |
| WV0657 #04 Y:2024 | 04 | 2024 | Use flue gases to heat process or service water | $5,370 | $18,750 | |
| WV0657 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $9,019 | $3,647 | |
| WV0657 #02 Y:2024 | 02 | 2024 | Use or replace with energy efficient substitutes | $21,406 | $98,076 | |
| WV0657 #01 Y:2024 | 01 | 2024 | Replace boiler | $38,907 | $149,240 | |
| SF0615 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $14,315 | $55,046 | |
| SF0615 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $941 | $1,884 | |
| SF0615 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,843 | $2,120 |