ITAC Assessment: WV0657
ITAC logo
ITAC Assessment: WV0657
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 57,111
ft2
Annual Production 12,000
thousand feet
Production Hrs. Annual 2,600
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,616 2,288,505
kWh
Electricity Demand $99,295 9,412
kW-mo/yr
Electricity Fees $5,800 -
Other Gas $465,535 20,544
MMBtu
TOTAL YEARLY COSTS $780,246
RECOMMENDED SAVINGS* $88,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,356

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings Personnel Changes Savings
01 2.1224: Replace boiler $38,907 $149,240 - - $38,907
-
MMBtu
-
02 2.4322: Use or replace with energy efficient substitutes $21,406 $98,076 $13,979
152,612
kWh
$7,427
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,019 $3,647 $5,886
64,255
kWh
$3,133
-
kW-mo/yr
- -
04 2.2425: Use flue gases to heat process or service water $5,370 $18,750 - - $5,370
-
MMBtu
-
05 2.4157: Establish a predictive maintenance program $4,482 $1,500 $3,469
37,866
kWh
$1,846
-
kW-mo/yr
- $(-833.0)
06 2.2511: Insulate bare equipment $2,493 $1,302 - - $2,493
-
MMBtu
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $2,266 $1,107 - - $2,266
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,181 $1,063 $1,421
15,517
kWh
$760
-
kW-mo/yr
- -
09 2.4151: Develop a repair/replace policy $1,429 $6,850 $1,322
14,432
kWh
$707
-
kW-mo/yr
- $(-600.0)
10 2.4239: Eliminate or reduce compressed air usage $486 $242 $317
3,459
kWh
$169
-
kW-mo/yr
- -
TOTAL RECOMMENDED $88,039 $281,777 $26,394
288,141
kWh
$14,042
-
kW-mo/yr
$49,036
-
MMBtu
$(-1,433.0)
TOTAL IMPLEMENTED $22,356 $15,711 $12,415
135,529
kWh
$6,615
-
kW-mo/yr
$4,759
-
MMBtu
$(-1,433.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs