ITAC Assessment: CC0036
ITAC logo
ITAC Assessment: CC0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Home Heating Pellets, Industrial Wood Flour, Animal Bedding
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 85,800
ft2
Annual Production 80,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,445,659 13,345,500
kWh
Electricity Fees $12,714 -
Natural Gas $15,961 1,848
MMBtu
TOTAL YEARLY COSTS $1,474,334
RECOMMENDED SAVINGS* $155,384 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $46,974 $309,771 $46,974
434,943
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $22,612 $12,962 $22,612
209,373
kWh
-
03 2.4133: Use most efficient type of electric motors $351 $1,191 $351
3,250
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,953 $3,987 $3,953
36,598
kWh
-
05 2.2437: Recover waste heat from equipment $3,480 $10,000 $(-596.3)
(-5,521)
kWh
$4,077
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,222 $10,000 $3,222
29,830
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $74,792 $250,000 $74,792
692,521
kWh
-
TOTAL RECOMMENDED $155,384 $597,910 $151,307
1,400,994
kWh
$4,077
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs