Assessment Year | 1995 |
---|---|
Principal Product | Electronic Components |
NAICS |
n/a
|
SIC | 3621: Motors and Generators |
Sales Range | $10 M to 50M |
# of Employees | 190 |
Plant Area |
106,000
ft2
|
Annual Production | 5,000
pieces
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $186,219 | 3,143,904 |
kWh
|
$0.059 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,071 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,382 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,182 | $1,290 |
$3,182
53,927
kWh
|
- | |
02 | 2.7233: Use properly designed and sized hvac equipment | $13,275 | $180,000 |
$13,275
224,795
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $1,443 | $8,000 |
$1,443
24,619
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,293 | $432 |
$1,293
21,981
kWh
|
- | |
05 | 2.7135: Install occupancy sensors | $1,245 | $3,600 |
$1,245
21,102
kWh
|
- | |
06 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $4,915 | $2,000 |
$4,915
83,236
kWh
|
- | |
07 | 2.7131: Add area lighting switches | $478 | $1,200 |
$478
8,206
kWh
|
- | |
08 | 2.7421: Reduce glazed areas in buildings | $5,285 | $1,400 |
$5,285
86,753
kWh
|
- | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,233 | $4,000 |
$6,233
105,803
kWh
|
- | |
10 | 2.7235: Install fossil fuel make-up air unit | $10,722 | $2,115 |
$16,793
284,584
kWh
|
$(-6,071.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $48,071 | $204,037 |
$54,142
915,006
kWh
|
$(-6,071.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,382 | $4,690 |
$13,382
223,916
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs