Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,380

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0702 #08 Y:2026 Reduce the pressure of compressed air to the minimum required $601 $600
WV0702 #07 Y:2026 Upgrade controls on compressors $1,542 $3,230
WV0702 #06 Y:2026 Develop a repair/replace policy $2,447 $4,567
WV0702 #05 Y:2026 Insulate bare equipment $2,470 $6,896
WV0702 #04 Y:2026 Utilize energy-efficient belts and other improved mechanisms $3,992 $12,610
WV0702 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $2,696 $4,150
WV0702 #02 Y:2026 Establish a predictive maintenance program $5,929 $1,500
WV0702 #01 Y:2026 Analyze flue gas for proper air/fuel ratio $8,496 $11,150
WV0701 #06 Y:2026 Reduce the pressure of compressed air to the minimum required $323 $525
WV0701 #05 Y:2026 Upgrade controls on compressors $2,789 $4,277
WV0701 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $5,930 $1,055
WV0701 #03 Y:2026 Insulate bare equipment $6,999 $3,108
WV0701 #02 Y:2026 Analyze flue gas for proper air/fuel ratio $12,998 $5,140
WV0701 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $16,067 $32,520
AS0621 #09 Y:2026 Install compressor air intakes in coolest locations $224 $1,573
AS0621 #08 Y:2026 Conserve energy by efficient use of vending machines $1,381 $547
AS0621 #07 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,673 $516
AS0621 #06 Y:2026 Install timers and/or thermostats $1,823 $1,826
AS0621 #05 Y:2026 Turn off equipment when not in use $1,828 $62
AS0621 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $2,939 $11,910