Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other apparel knitting mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0175 #06 Y:2020 Eliminate or reduce compressed air usage $2,780 $7,027
UU0175 #05 Y:2020 Minimize condenser cooling water temperature $4,532 $6,178
UU0175 #04 Y:2020 Eliminate or reduce compressed air usage $5,660 $6,931
UU0175 #03 Y:2020 Replace boiler $8,979 $46,872
UU0175 #02 Y:2020 Use computer programs to optimize hvac performance $31,653 $35,841
UU0175 #01 Y:2020 Eliminate/reduce an operation $154,852 $42,000
MI0341 #12 Y:2018 Analyze flue gas for proper air/fuel ratio $803 $1,560
MI0341 #11 Y:2018 Install occupancy sensors $3,246 $2,109
MI0341 #10 Y:2018 Optimize plant power factor $17,936 $25,045
MI0341 #09 Y:2018 Use optimum size and capacity equipment $24,956 $7,314
MI0341 #08 Y:2018 Install vinyl strip / high speed / air curtain doors $39,872 $3,380
MI0341 #07 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $45,466 $38,639
MI0341 #06 Y:2018 Utilize higher efficiency lamps and/or ballasts $49,910 $35,323
MI0341 #05 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $49,949 $6,410
MI0341 #04 Y:2018 Clean or color roof to reduce solar load $59,009 $48,268
MI0341 #03 Y:2018 Utilize a less expensive cooling method $69,002 $300,000
MI0341 #02 Y:2018 Use waste heat from hot flue gases to preheat $75,087 $115,295
MI0341 #01 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $142,227 $2,030
NC0521 #09 Y:2014 Develop a repair/replace policy $2,162 $4,256
NC0521 #08 Y:2014 Install occupancy sensors $2,313 $650