Assessment Year | 2014 |
---|---|
Principal Product | Fabric for lingerie |
NAICS | 315190: Other Apparel Knitting Mills |
SIC | 2254: Knit Underwear and Nightwear Mills |
Sales Range | $50 M to 100M |
# of Employees | 247 |
Plant Area |
175,000
ft2
|
Annual Production | 300,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $497,677 | 13,168,800 |
kWh
|
$0.038 |
Electricity Demand | $463,942 | 27,501 |
kW-mo/yr
|
$16.87 |
Electricity Fees | $3,480 | - |
|
- |
LPG | $971,857 | 53,781 |
MMBtu
|
$18.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $641,448 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $455,314 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $123,080 | $103,307 |
$10,699
283,049
kWh
|
$6,851
-
kW-mo/yr
|
$105,530
-
MMBtu
|
- | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $364,896 | $1,350,000 | - | - |
$69,410
-
MMBtu
|
$22,182
-
Tgal
|
$273,304 | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $57,030 | $40,000 | - |
$57,030
-
kW-mo/yr
|
- | - | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $21,678 | $40,000 | - | - |
$21,678
-
MMBtu
|
- | - | |
05 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $41,376 | $72,000 |
$14,311
378,600
kWh
|
$27,065
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,043 | $5,100 |
$1,080
28,560
kWh
|
$963
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,870 | $102,717 |
$11,679
308,977
kWh
|
$9,298
-
kW-mo/yr
|
- | - | $5,893 | |
08 | 2.7135: Install occupancy sensors | $2,313 | $650 |
$2,313
61,182
kWh
|
- | - | - | - | |
09 | 2.4151: Develop a repair/replace policy | $2,162 | $4,256 |
$1,142
30,221
kWh
|
$1,020
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $641,448 | $1,718,030 |
$41,224
1,090,589
kWh
|
$102,227
-
kW-mo/yr
|
$196,618
-
MMBtu
|
$22,182
-
Tgal
|
$279,197 | ||
TOTAL IMPLEMENTED | $455,314 | $1,502,723 |
$16,214
428,940
kWh
|
$68,311
-
kW-mo/yr
|
$69,410
-
MMBtu
|
$22,182
-
Tgal
|
$279,197 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs