ITAC Assessment: OK0271
ITAC logo
ITAC Assessment: OK0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MEN AND BOYS JEANS
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area
n/a
Annual Production 220,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,723 592,321
kWh
Natural Gas $2,772 583
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $307 $375 $307
4,689
kWh
- -
02 2.2437: Recover waste heat from equipment $1,159 $1,070 - $1,159
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $1,077 $1,055 - $1,077
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $180 - $180
2,052
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $26 $32 $26
586
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $731 - $801
12,309
kWh
- $(-70.0)
TOTAL RECOMMENDED $3,480 $2,532 $1,314
19,636
kWh
$2,236
-
MMBtu
$(-70.0)
TOTAL IMPLEMENTED $1,244 $407 $1,314
19,636
kWh
- $(-70.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs