138
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UU0175 #06 Y:2020 | 06 | 2020 | Eliminate or reduce compressed air usage | $2,780 | $7,027 | |
UU0175 #05 Y:2020 | 05 | 2020 | Minimize condenser cooling water temperature | $4,532 | $6,178 | |
UU0175 #04 Y:2020 | 04 | 2020 | Eliminate or reduce compressed air usage | $5,660 | $6,931 | |
UU0175 #03 Y:2020 | 03 | 2020 | Replace boiler | $8,979 | $46,872 | |
UU0175 #02 Y:2020 | 02 | 2020 | Use computer programs to optimize hvac performance | $31,653 | $35,841 | |
UU0175 #01 Y:2020 | 01 | 2020 | Eliminate/reduce an operation | $154,852 | $42,000 | |
NC0642 #05 Y:2019 | 05 | 2019 | Install occupancy sensors | $401 | $1,798 | |
NC0642 #04 Y:2019 | 04 | 2019 | Change rate schedules or other changes in utility service | $16,383 | $500 | |
NC0642 #03 Y:2019 | 03 | 2019 | Reduce the pressure of compressed air to the minimum required | $2,398 | $120 | |
NC0642 #02 Y:2019 | 02 | 2019 | Install / repair insulation on steam lines | $505 | $480 | |
NC0642 #01 Y:2019 | 01 | 2019 | Install outside air damper / economizer on hvac unit | $214 | $1,000 | |
MI0341 #12 Y:2018 | 12 | 2018 | Analyze flue gas for proper air/fuel ratio | $803 | $1,560 | |
MI0341 #11 Y:2018 | 11 | 2018 | Install occupancy sensors | $3,246 | $2,109 | |
MI0341 #10 Y:2018 | 10 | 2018 | Optimize plant power factor | $17,936 | $25,045 | |
MI0341 #09 Y:2018 | 09 | 2018 | Use optimum size and capacity equipment | $24,956 | $7,314 | |
MI0341 #08 Y:2018 | 08 | 2018 | Install vinyl strip / high speed / air curtain doors | $39,872 | $3,380 | |
MI0341 #07 Y:2018 | 07 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $45,466 | $38,639 | |
MI0341 #06 Y:2018 | 06 | 2018 | Utilize higher efficiency lamps and/or ballasts | $49,910 | $35,323 | |
MI0341 #05 Y:2018 | 05 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $49,949 | $6,410 | |
MI0341 #04 Y:2018 | 04 | 2018 | Clean or color roof to reduce solar load | $59,009 | $48,268 |