ITAC Assessment: NC0642
ITAC logo
ITAC Assessment: NC0642
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Socks
NAICS 315110: Hosiery and Sock Mills
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 130,000
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 2,250
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,762 3,399,030
kWh
Electricity Demand $89,990 16,809
kW-mo/yr
Natural Gas $112,874 14,658
MMBtu
TOTAL YEARLY COSTS $368,626
RECOMMENDED SAVINGS* $19,901 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,383

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $214 $1,000 $214
4,390
kWh
- -
02 2.2136: Install / repair insulation on steam lines $505 $480 - - $505
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,398 $120 $1,514
31,032
kWh
$884
-
kW-mo/yr
-
04 2.8114: Change rate schedules or other changes in utility service $16,383 $500 $16,383
-
kWh
- -
05 2.7135: Install occupancy sensors $401 $1,798 $401
8,211
kWh
- -
TOTAL RECOMMENDED $19,901 $3,898 $18,512
43,633
kWh
$884
-
kW-mo/yr
$505
-
MMBtu
TOTAL IMPLEMENTED $16,383 $500 $16,383
-
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs