414
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UK1510 #02 Y:2015 | 02 | 2015 | Use photocell controls | $3,354 | $750 | |
| UK1510 #01 Y:2015 | 01 | 2015 | Upgrade controls on compressors | $10,047 | $6,250 | |
| NC0547 #13 Y:2015 | 13 | 2015 | Recharge batteries on during off-peak demand periods | $675 | $200 | |
| NC0547 #12 Y:2015 | 12 | 2015 | Replace existing hvac unit with high efficiency model | $231 | $1,000 | |
| NC0547 #11 Y:2015 | 11 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $1,688 | $281 | |
| NC0547 #10 Y:2015 | 10 | 2015 | Develop a repair/replace policy | $2,028 | $4,256 | |
| NC0547 #09 Y:2015 | 09 | 2015 | Redesign process | $461 | $2,000 | |
| NC0547 #08 Y:2015 | 08 | 2015 | Install occupancy sensors | $88 | $100 | |
| NC0547 #07 Y:2015 | 07 | 2015 | Reduce illumination to minimum necessary levels | $883 | $500 | |
| NC0547 #06 Y:2015 | 06 | 2015 | Repair or replace steam traps | $2,433 | $11,840 | |
| NC0547 #05 Y:2015 | 05 | 2015 | Insulate bare equipment | $3,947 | $2,800 | |
| NC0547 #04 Y:2015 | 04 | 2015 | Eliminate or reduce compressed air usage | $675 | $1,800 | |
| NC0547 #03 Y:2015 | 03 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,425 | $100 | |
| NC0547 #02 Y:2015 | 02 | 2015 | Reduce the pressure of compressed air to the minimum required | $6,024 | $100 | |
| NC0547 #01 Y:2015 | 01 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $33,570 | $50,000 | |
| NC0521 #09 Y:2014 | 09 | 2014 | Develop a repair/replace policy | $2,162 | $4,256 | |
| NC0521 #08 Y:2014 | 08 | 2014 | Install occupancy sensors | $2,313 | $650 | |
| NC0521 #07 Y:2014 | 07 | 2014 | Utilize higher efficiency lamps and/or ballasts | $26,870 | $102,717 | |
| NC0521 #06 Y:2014 | 06 | 2014 | Utilize higher efficiency lamps and/or ballasts | $2,043 | $5,100 | |
| NC0521 #05 Y:2014 | 05 | 2014 | Use waste heat from hot flue gases to preheat incoming fluids | $41,376 | $72,000 |