Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

414

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Apparel manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0792 #04 Y:2004 Repair or replace steam traps $9,228 $11,000
GT0792 #03 Y:2004 Reduce illumination to minimum necessary levels $5,050 $616
GT0792 #02 Y:2004 Reduce combustion air flow to optimum $19,495 $3,060
GT0792 #01 Y:2004 Repair and eliminate steam leaks $21,335 $10,000
NC0298 #09 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $219 $100
NC0298 #08 Y:2004 Utilize higher efficiency lamps and/or ballasts $797 $1,315
NC0298 #07 Y:2004 Install / repair insulation on steam lines $1,037 $1,335
NC0298 #06 Y:2004 Increase amount of condensate returned $1,388 $900
NC0298 #05 Y:2004 Convert combustion equipment to burn oil $21,805 $15,800
NC0298 #04 Y:2004 Minimize boiler blowdown with better feedwater treatment $1,175 $1,200
NC0298 #03 Y:2004 Adjust burners for efficient operation $1,163 $800
NC0298 #02 Y:2004 Change rate schedules or other changes in utility service $8,603 $1,000
NC0298 #01 Y:2004 Install refrigeration system to cool product $9,750 -
MI0090 #07 Y:2004 Lower temperature during the winter season and vice-versa $25,291 $6,163
MI0090 #06 Y:2004 Reduce the pressure of compressed air to the minimum required $3,333 $112
MI0090 #05 Y:2004 Use optimum size and capacity equipment $1,667 $5,660
MI0090 #04 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $7,398 $590
MI0090 #03 Y:2004 Eliminate or reduce compressed air usage $1,440 $610
MI0090 #02 Y:2004 Turn off equipment when not in use $53,281 $47,250
MI0090 #01 Y:2004 Change rate schedules or other changes in utility service $4,659 $600