414
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT0792 #04 Y:2004 | 04 | 2004 | Repair or replace steam traps | $9,228 | $11,000 | |
| GT0792 #03 Y:2004 | 03 | 2004 | Reduce illumination to minimum necessary levels | $5,050 | $616 | |
| GT0792 #02 Y:2004 | 02 | 2004 | Reduce combustion air flow to optimum | $19,495 | $3,060 | |
| GT0792 #01 Y:2004 | 01 | 2004 | Repair and eliminate steam leaks | $21,335 | $10,000 | |
| NC0298 #09 Y:2004 | 09 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $219 | $100 | |
| NC0298 #08 Y:2004 | 08 | 2004 | Utilize higher efficiency lamps and/or ballasts | $797 | $1,315 | |
| NC0298 #07 Y:2004 | 07 | 2004 | Install / repair insulation on steam lines | $1,037 | $1,335 | |
| NC0298 #06 Y:2004 | 06 | 2004 | Increase amount of condensate returned | $1,388 | $900 | |
| NC0298 #05 Y:2004 | 05 | 2004 | Convert combustion equipment to burn oil | $21,805 | $15,800 | |
| NC0298 #04 Y:2004 | 04 | 2004 | Minimize boiler blowdown with better feedwater treatment | $1,175 | $1,200 | |
| NC0298 #03 Y:2004 | 03 | 2004 | Adjust burners for efficient operation | $1,163 | $800 | |
| NC0298 #02 Y:2004 | 02 | 2004 | Change rate schedules or other changes in utility service | $8,603 | $1,000 | |
| NC0298 #01 Y:2004 | 01 | 2004 | Install refrigeration system to cool product | $9,750 | - | |
| MI0090 #07 Y:2004 | 07 | 2004 | Lower temperature during the winter season and vice-versa | $25,291 | $6,163 | |
| MI0090 #06 Y:2004 | 06 | 2004 | Reduce the pressure of compressed air to the minimum required | $3,333 | $112 | |
| MI0090 #05 Y:2004 | 05 | 2004 | Use optimum size and capacity equipment | $1,667 | $5,660 | |
| MI0090 #04 Y:2004 | 04 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,398 | $590 | |
| MI0090 #03 Y:2004 | 03 | 2004 | Eliminate or reduce compressed air usage | $1,440 | $610 | |
| MI0090 #02 Y:2004 | 02 | 2004 | Turn off equipment when not in use | $53,281 | $47,250 | |
| MI0090 #01 Y:2004 | 01 | 2004 | Change rate schedules or other changes in utility service | $4,659 | $600 |