Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

414

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Apparel manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0131 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $6,260 $17,852
DL0131 #04 Y:2014 Install automatic stack damper $1,840 $2,800
DL0131 #03 Y:2014 Recover waste heat from equipment $20,280 $40,560
DL0131 #02 Y:2014 Treat and reuse rinse waters $13,430 $24,000
DL0131 #01 Y:2014 Recover heat from exhausted steam, hot air or hot water $10,900 $8,500
NC0505 #09 Y:2013 Develop a repair/replace policy $2,259 $4,256
NC0505 #08 Y:2013 Install occupancy sensors $2,395 $1,909
NC0505 #07 Y:2013 Reduce illumination to minimum necessary levels $1,993 $319
NC0505 #06 Y:2013 Recharge batteries on during off-peak demand periods $1,874 $200
NC0505 #05 Y:2013 Upgrade controls on compressors $1,108 $100
NC0505 #04 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $6,186 $100
NC0505 #03 Y:2013 Recover waste heat from equipment $33,641 $67,830
NC0505 #02 Y:2013 Utilize a less expensive cooling method $14,010 $20,000
NC0505 #01 Y:2013 Minimize boiler blowdown with better feedwater treatment $1,293 $200
NC0474 #09 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $6,672 $100
NC0474 #08 Y:2012 Repair or replace steam traps $13,419 $5,700
NC0474 #07 Y:2012 Use heat from boiler blowdown to preheat boiler feed water $11,656 $25,000
NC0474 #06 Y:2012 Analyze flue gas for proper air/fuel ratio $1,431 $1,000
NC0474 #05 Y:2012 Install occupancy sensors $1,019 $3,470
NC0474 #04 Y:2012 Use photocell controls $3,817 $7,000