ITAC Assessment: DL0131
ITAC logo
ITAC Assessment: DL0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Clothing
NAICS 315280: Other Cut and Sew Apparel Manufacturing
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 69
Plant Area 40,000
ft2
Annual Production 83,000
pieces
Production Hrs. Annual 2,856
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,549 509,000
kWh
Natural Gas $101,040 17,623
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,970

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $10,900 $8,500 - $10,900
-
MMBtu
-
02 3.4113: Treat and reuse rinse waters $13,430 $24,000 - $6,600
-
MMBtu
$6,830
-
gal
03 2.2437: Recover waste heat from equipment $20,280 $40,560 - $20,280
-
MMBtu
-
04 2.1123: Install automatic stack damper $1,840 $2,800 - $1,840
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,260 $17,852 $6,260
56,400
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $520 $1,910 $520
4,690
kWh
- -
07 2.7135: Install occupancy sensors $850 $200 $850
7,670
kWh
- -
08 2.2437: Recover waste heat from equipment $430 $1,400 - $430
-
MMBtu
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,970 $700 $1,970
17,750
kWh
- -
TOTAL RECOMMENDED $56,480 $97,922 $9,600
86,510
kWh
$40,050
-
MMBtu
$6,830
-
gal
TOTAL IMPLEMENTED $1,970 $700 $1,970
17,750
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs