ITAC Assessment: MI0130
ITAC logo
ITAC Assessment: MI0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Whirpool spas
NAICS 326191: Plastics Plumbing Fixture Manufacturing
SIC 3088: Plastics Plumbing Fixtures
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 160,000
ft2
Annual Production 21,675
pieces
Production Hrs. Annual 2,168
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,147 2,670,451
kWh
Electricity Demand $127,793 16,560
kW-mo/yr
Electricity Fees $58,512 -
Natural Gas $47,655 4,247
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,657

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
01 2.5194: Redesign process $7,148 $580 - - - $7,148
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $5,958 $202 $3,658
64,627
kWh
$2,300
-
kW-mo/yr
- -
03 2.2531: Re-size charging openings or add movable cover or door $4,791 $1,020 - - $4,791
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,865 $1,074 $2,321
41,011
kWh
$1,544
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $3,043 $720 $2,669
46,046
kWh
$374
-
kW-mo/yr
- -
06 2.4323: Use optimum size and capacity equipment $1,895 $3,800 $1,372
24,232
kWh
$523
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,650 $30 $888
15,683
kWh
$762
-
kW-mo/yr
- -
TOTAL RECOMMENDED $28,350 $7,426 $10,908
191,599
kWh
$5,503
-
kW-mo/yr
$4,791
-
MMBtu
$7,148
-
MMBtu
TOTAL IMPLEMENTED $23,657 $6,676 $7,351
129,870
kWh
$4,367
-
kW-mo/yr
$4,791
-
MMBtu
$7,148
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs