ITAC Assessment: SU0268
ITAC logo
ITAC Assessment: SU0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Blades for aerospace and power generation
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 297
Plant Area 240,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,318,351 18,574,451
kWh
Electricity Demand $214,526 33,046
kW-mo/yr
Electricity Fees $60,488 -
Natural Gas $285,670 28,771
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,837 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,731

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $15,465 - $13,259
176,779
kWh
$2,206
-
kW-mo/yr
- - -
02 4.821: Pay bills on time to avoid late fees $854 - - - - $854 -
03 2.4221: Install compressor air intakes in coolest locations $22,823 $1,071 $19,572
260,957
kWh
$3,251
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,511 $1,250 $5,583
74,443
kWh
$928
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $310 $385 $177
2,365
kWh
$19
-
kW-mo/yr
- - $114
06 2.7142: Utilize higher efficiency lamps and/or ballasts $39,769 $83,044 $34,097
454,460
kWh
$5,672
-
kW-mo/yr
- - -
07 2.6211: Conserve energy by efficient use of vending machines $781 $1,451 $781
10,408
kWh
- - - -
08 2.7135: Install occupancy sensors $318 $674 $318
4,243
kWh
- - - -
09 2.3212: Optimize plant power factor $11,006 $39,533 - - $11,006 - -
TOTAL RECOMMENDED $97,837 $127,408 $73,787
983,655
kWh
$12,076
-
kW-mo/yr
$11,006 $854 $114
TOTAL IMPLEMENTED $69,731 $86,424 $59,747
796,468
kWh
$9,870
-
kW-mo/yr
- - $114
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs