ITAC Assessment: OR0382
ITAC logo
ITAC Assessment: OR0382
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Fruit Puree
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 20,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 6,336
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $234,087 6,798,652
kWh
Electricity Demand $61,881 219,840
kW-mo/yr
Electricity Fees $21,219 -
Natural Gas $1,099,542 283,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,745 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $110,260

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.1231: Establish burner maintenance schedule for boilers $26,817 $900 - - - $26,817
-
MMBtu
- - - - -
02 2.4133: Use most efficient type of electric motors $15,208 $26,491 $12,024
349,355
kWh
$3,184
-
kW-mo/yr
- - - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,194 $2,979 $1,810
52,462
kWh
$244
-
kW-mo/yr
- - - - - $2,140 -
04 2.2621: Modify refrigeration system to operate at a lower pressure $2,050 $4,653 $2,050
59,496
kWh
- - - - - - - -
05 2.3212: Optimize plant power factor $2,241 $6,400 - - $2,241 - - - - - -
06 3.1181: Eliminate a by-product $68,235 $2,000 - - - - $(-2,345.0)
-
MMBtu
$3,180
-
lb
$(-12,600.0) - $80,000
TOTAL RECOMMENDED $118,745 $43,423 $15,884
461,313
kWh
$3,428
-
kW-mo/yr
$2,241 $26,817
-
MMBtu
$(-2,345.0)
-
MMBtu
$3,180
-
lb
$(-12,600.0) $2,140 $80,000
TOTAL IMPLEMENTED $110,260 $29,391 $12,024
349,355
kWh
$3,184
-
kW-mo/yr
- $26,817
-
MMBtu
$(-2,345.0)
-
MMBtu
$3,180
-
lb
$(-12,600.0) - $80,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs