ITAC Assessment: OR0245
ITAC logo
ITAC Assessment: OR0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Winches
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 380
Plant Area 200,000
ft2
Annual Production 3,744,000
lb
Production Hrs. Annual 4,800
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,225 6,330,305
kWh
Natural Gas $14,024 2,612
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $125,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $123,719

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,044 $4,000 $3,044
70,633
kWh
- -
02 2.6218: Turn off equipment when not in use $469 - $469
12,896
kWh
- -
03 2.4133: Use most efficient type of electric motors $1,558 $5,558 $1,558
28,136
kWh
- -
04 3.1191: Change procedures / equipment / operating conditions $106,051 $89,900 $(-4,439.0)
(-62,720)
kWh
- $110,490
-
lb
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $14,155 $20,000 $(-95.0)
(-1,172)
kWh
$14,250
-
Tgal
-
TOTAL RECOMMENDED $125,277 $119,458 $537
47,773
kWh
$14,250
-
Tgal
$110,490
-
lb
TOTAL IMPLEMENTED $123,719 $113,900 $(-1,021.0)
19,637
kWh
$14,250
-
Tgal
$110,490
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs