ITAC Assessment: NC0505
ITAC logo
ITAC Assessment: NC0505
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Socks
NAICS 315110: Hosiery and Sock Mills
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 450,000
ft2
Annual Production 40,800,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $540,659 12,606,000
kWh
Electricity Demand $337,002 28,970
kW-mo/yr
Electricity Fees $981 -
Natural Gas $397,171 77,268
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,759 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,713

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1242: Minimize boiler blowdown with better feedwater treatment $1,293 $200 - - - $993
-
MMBtu
- $300
02 2.2628: Utilize a less expensive cooling method $14,010 $20,000 $9,649
224,928
kWh
$4,361
-
kW-mo/yr
- - - -
03 2.2437: Recover waste heat from equipment $33,641 $67,830 - - - $33,641
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,186 $100 $4,839
112,795
kWh
$2,187
-
kW-mo/yr
- - $(-600.0) $(-240.0)
05 2.4224: Upgrade controls on compressors $1,108 $100 $763
17,784
kWh
$345
-
kW-mo/yr
- - - -
06 2.3132: Recharge batteries on during off-peak demand periods $1,874 $200 - $887
-
kW-mo/yr
$987 - - -
07 2.7111: Reduce illumination to minimum necessary levels $1,993 $319 $1,189
27,720
kWh
$538
-
kW-mo/yr
- - - $266
08 2.7135: Install occupancy sensors $2,395 $1,909 $2,395
55,836
kWh
- - - - -
09 2.4151: Develop a repair/replace policy $2,259 $4,256 $1,556
36,266
kWh
$703
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $64,759 $94,914 $20,391
475,329
kWh
$9,021
-
kW-mo/yr
$987 $34,634
-
MMBtu
$(-600.0) $326
TOTAL IMPLEMENTED $14,713 $5,175 $8,347
194,565
kWh
$4,660
-
kW-mo/yr
$987 $993
-
MMBtu
$(-600.0) $326
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs