ITAC Assessment: LL0317
ITAC logo
ITAC Assessment: LL0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Electronic switch grear
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 128
Plant Area 70,000
ft2
Annual Production 150,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,348 1,040,460
kWh
Electricity Fees $8,546 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,072 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,618

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,852 $5,555 $8,965
108,019
kWh
$887 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,129 $30 $1,937
23,936
kWh
$192 -
03 2.7224: Reduce space conditioning during non-working hours $876 $198 $797
9,601
kWh
$79 -
04 2.6211: Conserve energy by efficient use of vending machines $637 $623 $580
6,989
kWh
$57 -
05 2.7135: Install occupancy sensors $335 $90 $305
3,673
kWh
$30 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $243 $140 $111
1,332
kWh
$11 $121
TOTAL RECOMMENDED $14,072 $6,636 $12,695
153,550
kWh
$1,256 $121
TOTAL IMPLEMENTED $12,618 $6,208 $11,482
138,944
kWh
$1,136 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs