414
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0347 #11 Y:2025 | 11 | 2025 | Apply for tax-free status for energy purchases | $517 | - |
n/a
|
| TT0347 #10 Y:2025 | 10 | 2025 | Insulate bare equipment | $1,601 | $199 |
n/a
|
| TT0347 #09 Y:2025 | 09 | 2025 | Analyze flue gas for proper air/fuel ratio | $2,000 | $700 |
n/a
|
| TT0347 #08 Y:2025 | 08 | 2025 | Use existing dam to generate electricity | $3,660 | $6,000 |
n/a
|
| TT0347 #07 Y:2025 | 07 | 2025 | Reduce the pressure of compressed air to the minimum required | $6,809 | $150 |
n/a
|
| TT0347 #06 Y:2025 | 06 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $7,940 | $3,560 |
n/a
|
| TT0347 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $11,471 | $600 |
n/a
|
| TT0347 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $27,027 | $5,064 |
n/a
|
| TT0347 #03 Y:2025 | 03 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $35,160 | $35,240 |
n/a
|
| TT0347 #02 Y:2025 | 02 | 2025 | Use solar heat to make electricty | $44,449 | $274,845 |
n/a
|
| TT0347 #01 Y:2025 | 01 | 2025 | Combine utility meters | $71,600 | $480 |
n/a
|
| UL2503 #05 Y:2025 | 05 | 2025 | Recover waste heat from equipment | $2,094 | $7,500 |
n/a
|
| UL2503 #04 Y:2025 | 04 | 2025 | Use solar heat to make electricty | $53,722 | $482,406 |
n/a
|
| UL2503 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $17,129 | $32,120 |
n/a
|
| UL2503 #02 Y:2025 | 02 | 2025 | Optimize plant power factor | $6,739 | $14,223 |
n/a
|
| UL2503 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,701 | $2,100 |
n/a
|
| UU0246 #07 Y:2024 | 07 | 2024 | Use automatic flow control | $4,727 | $4,633 | |
| UU0246 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $8,970 | $42,406 | |
| UU0246 #05 Y:2024 | 05 | 2024 | Turn off equipment during breaks, reduce operating time | $1,731 | $338 | |
| UU0246 #04 Y:2024 | 04 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $520 | $123 |