56
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Rope, cordage, twine, tire cord, and tire fabric mills | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LS2419 #05 Y:2024 | 05 | 2024 | Use solar heat to make electricty | $38,616 | $514,800 |
n/a
|
LS2419 #04 Y:2024 | 04 | 2024 | Upgrade obsolete equipment | $56,850 | $580,000 |
n/a
|
LS2419 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $7,609 | $51,689 |
n/a
|
LS2419 #02 Y:2024 | 02 | 2024 | Use other waste concentration methods | $50,241 | $154,466 |
n/a
|
LS2419 #01 Y:2024 | 01 | 2024 | Improve space comfort conditioning | $6,299 | $17,640 |
n/a
|
UW2301 #05 Y:2023 | 05 | 2023 | Use most efficient type of electric motors | $13,590 | $77,405 | |
UW2301 #04 Y:2023 | 04 | 2023 | Reduce the pressure of compressed air to the minimum required | $729 | - | |
UW2301 #03 Y:2023 | 03 | 2023 | Install compressor air intakes in coolest locations | $1,976 | $295 | |
UW2301 #02 Y:2023 | 02 | 2023 | Install occupancy sensors | $82 | $344 | |
UW2301 #01 Y:2023 | 01 | 2023 | Utilize higher efficiency lamps and/or ballasts | $7,523 | $16,133 | |
OK0784 #09 Y:2009 | 09 | 2009 | Install timers and/or thermostats | $858 | $990 | |
OK0784 #08 Y:2009 | 08 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,788 | - | |
OK0784 #07 Y:2009 | 07 | 2009 | Reduce the pressure of compressed air to the minimum required | $4,104 | - | |
OK0784 #06 Y:2009 | 06 | 2009 | Install compressor air intakes in coolest locations | $888 | $1,098 | |
OK0784 #05 Y:2009 | 05 | 2009 | Install occupancy sensors | $362 | $1,013 | |
OK0784 #04 Y:2009 | 04 | 2009 | Install occupancy sensors | $1,600 | $620 | |
OK0784 #03 Y:2009 | 03 | 2009 | Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $11,003 | - | |
OK0784 #02 Y:2009 | 02 | 2009 | Replace existing equipment with more suitable substitutes | $26,522 | $23,859 | |
OK0784 #01 Y:2009 | 01 | 2009 | Insulate bare equipment | $32,802 | $10,627 | |
SU0278 #10 Y:2008 | 10 | 2008 | Optimize plant power factor | $7,344 | $28,458 |