ITAC Assessment: SU0278
ITAC logo
ITAC Assessment: SU0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Tire Cord
NAICS 314994: Rope, Cordage, Twine, Tire Cord, and Tire Fabric Mills
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 152
Plant Area 396,000
ft2
Annual Production 16,950,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,550,142 20,345,288
kWh
Electricity Demand $184,491 37,579
kW-mo/yr
Electricity Fees $118,783 -
Natural Gas $770,310 70,331
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,693 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,934

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $25,359 - $22,614
279,180
kWh
$2,745
-
kW-mo/yr
-
02 2.4314: Use synthetic lubricant $8,358 - $7,445
91,920
kWh
$913
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $8,050 - $7,181
88,640
kWh
$869
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $4,305 $528 $3,839
47,400
kWh
$466
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,615 $410 $3,222
39,780
kWh
$393
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $44,212 $7,299 $44,212
545,824
kWh
- -
07 2.2511: Insulate bare equipment $1,289 $1,820 $1,289
15,910
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,049 $6,721 $3,593
44,376
kWh
$456
-
kW-mo/yr
-
09 2.6211: Conserve energy by efficient use of vending machines $112 $271 $112
1,379
kWh
- -
10 2.3212: Optimize plant power factor $7,344 $28,458 - - $7,344
TOTAL RECOMMENDED $106,693 $45,507 $93,507
1,154,409
kWh
$5,842
-
kW-mo/yr
$7,344
TOTAL IMPLEMENTED $96,934 $43,416 $84,661
1,045,200
kWh
$4,929
-
kW-mo/yr
$7,344
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs