Assessment Year | 1999 |
---|---|
Principal Product | wood doors and cabinetry |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
180,000
ft2
|
Annual Production | 72,800
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $89,069 | 3,304,514 |
kWh
|
$0.027 |
Electricity Demand | $71,745 | 10,116 |
kW-mo/yr
|
$7.09 |
Natural Gas | $49,297 | 8,829 |
MMBtu
|
$5.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,755 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,780 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $22,643 | $12,000 | - | - |
$22,643
-
MMBtu
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,292 | $2,306 |
$596
22,274
kWh
|
$696
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,488 | $231 |
$647
24,033
kWh
|
$841
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $370 | $1,417 |
$158
5,862
kWh
|
$212
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.7135: Install occupancy sensors | $337 | $1,530 |
$337
12,603
kWh
|
- | - | - | - | - | - | |
06 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $11,418 | $7,660 | - | - | - | - |
$6,732
-
lb
|
$(-1,434.0) | $6,120 | |
07 | 3.3113: Use other methods for neutralization | $6,207 | $100 | - | - | - |
$11,000
-
gal
|
$(-4,793.0)
-
lb
|
- | - | |
TOTAL RECOMMENDED | $43,755 | $25,244 |
$1,738
64,772
kWh
|
$1,749
-
kW-mo/yr
|
$22,643
-
MMBtu
|
$11,000
-
gal
|
$1,939
-
lb
|
$(-1,434.0) | $6,120 | ||
TOTAL IMPLEMENTED | $2,780 | $2,537 |
$1,243
46,307
kWh
|
$1,537
-
kW-mo/yr
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs