Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Curtain and linen mills
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0921 #05 Y:2018 Utilize higher efficiency lamps and/or ballasts $6,972 $32,568
GT0921 #04 Y:2018 Reduce the pressure of compressed air to the minimum required $947 $3,500
GT0921 #03 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $543 $847
GT0921 #02 Y:2018 Install occupancy sensors $1,446 $1,974
GT0921 #01 Y:2018 Install heat pipes / raise cooling setpoint $6,221 $200
NC0492 #07 Y:2013 Reduce the pressure of compressed air to the minimum required $60 $90
NC0492 #06 Y:2013 Reduce space conditioning during non-working hours $20,838 $12,000
NC0492 #05 Y:2013 Reschedule plant operations or reduce load to avoid peaks $688 -
NC0492 #04 Y:2013 Reschedule plant operations or reduce load to avoid peaks $1,869 $100
NC0492 #03 Y:2013 Use photocell controls $259 $250
NC0492 #02 Y:2013 Reduce illumination to minimum necessary levels $6,492 $1,140
NC0492 #01 Y:2013 Install occupancy sensors $8,471 $13,495
OK0792 #11 Y:2010 Replace existing hvac unit with high efficiency model $5,037 $78,057
OK0792 #10 Y:2010 Use proper thickness of insulation on building envelope $6,203 $109,200
OK0792 #09 Y:2010 Insulate bare equipment $156 $143
OK0792 #08 Y:2010 Install / repair insulation on steam lines $304 $902
OK0792 #07 Y:2010 Optimize plant power factor $1,160 $11,630
OK0792 #06 Y:2010 Reduce illumination to minimum necessary levels $741 $644
OK0792 #05 Y:2010 Utilize higher efficiency lamps and/or ballasts $1,607 $8,168
OK0792 #04 Y:2010 Utilize higher efficiency lamps and/or ballasts $733 $2,755