ITAC Assessment: OK0792
ITAC logo
ITAC Assessment: OK0792
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Poly Pillow/ Feather Pillows/ Comforters
NAICS 314120: Curtain and Linen Mills
SIC 2329: Men's and Boys' Clothing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 100,000
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,032 1,751,387
kWh
Natural Gas $21,286 2,492
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,912 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,749

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $2,543 $3,114 - - $2,543
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $959 $750 $959
16,150
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $469 $275 $469
7,887
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $733 $2,755 $733
12,340
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,607 $8,168 $1,607
27,062
kWh
- -
06 2.7111: Reduce illumination to minimum necessary levels $741 $644 $741
12,472
kWh
- -
07 2.3212: Optimize plant power factor $1,160 $11,630 - $1,160
-
kW-mo/yr
-
08 2.2136: Install / repair insulation on steam lines $304 $902 $304
5,119
kWh
- -
09 2.2511: Insulate bare equipment $156 $143 $156
2,638
kWh
- -
10 2.7492: Use proper thickness of insulation on building envelope $6,203 $109,200 - - $6,203
-
MMBtu
11 2.7232: Replace existing hvac unit with high efficiency model $5,037 $78,057 $5,037
84,807
kWh
- -
TOTAL RECOMMENDED $19,912 $215,638 $10,006
168,475
kWh
$1,160
-
kW-mo/yr
$8,746
-
MMBtu
TOTAL IMPLEMENTED $5,749 $8,440 $3,206
53,968
kWh
- $2,543
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs