| Assessment Year | 1999 |
|---|---|
| Principal Product | Prepared Spices and Roasted Coffee |
| NAICS |
n/a
|
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 22 |
| Plant Area |
50,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $21,540 | 271,981 |
kWh
|
$0.079 |
| Electricity Demand | $1,248 | 1,892 |
kW-mo/yr
|
$0.66 |
| Electricity Fees | $1,356 | - |
|
- |
| Natural Gas | $5,247 | 732 |
MMBtu
|
$7.17 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,672 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $849 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $331 | $773 |
$317
4,103
kWh
|
$14
-
kW-mo/yr
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $849 | $800 |
$849
10,844
kWh
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $79 | $20 |
$79
879
kWh
|
- | |
| 04 | 2.4113: Install motor voltage controller on lightly loaded motors | $413 | $1,870 |
$395
4,982
kWh
|
$18
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $1,672 | $3,463 |
$1,640
20,808
kWh
|
$32
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $849 | $800 |
$849
10,844
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs