ITAC Assessment: NC0492
ITAC logo
ITAC Assessment: NC0492
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Curtains and household textiles
NAICS 314120: Curtain and Linen Mills
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $50
M
to 100
M
# of Employees 164
Plant Area 394,028
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,634 2,156,470
kWh
Electricity Demand $60,615 7,069
kW-mo/yr
Electricity Fees $8,516 -
Natural Gas $38,736 4,504
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,677 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,180

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $8,471 $13,495 $8,471
158,784
kWh
- - -
02 2.7111: Reduce illumination to minimum necessary levels $6,492 $1,140 $2,984
55,935
kWh
$2,492
-
kW-mo/yr
- $1,016
03 2.7134: Use photocell controls $259 $250 $127
2,376
kWh
$132
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,869 $100 - $1,869
-
kW-mo/yr
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $688 - - $688
-
kW-mo/yr
- -
06 2.7224: Reduce space conditioning during non-working hours $20,838 $12,000 $14,709
275,711
kWh
$4,237
-
kW-mo/yr
$1,892
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $60 $90 $32
605
kWh
$28
-
kW-mo/yr
- -
TOTAL RECOMMENDED $38,677 $27,075 $26,323
493,411
kWh
$9,446
-
kW-mo/yr
$1,892
-
MMBtu
$1,016
TOTAL IMPLEMENTED $7,180 $1,140 $2,984
55,935
kWh
$3,180
-
kW-mo/yr
- $1,016
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs